4
|
Components
Service manual
53
RXTM-R+RXTP-R+ARXTP-R+RXTA-B+FTXTA30B2V1B(W)
(B)+35M5V1B
R32 Optimized Heating 4 Split
ESIE21-12A – 2022.02
Is the flow correct?
Action
Yes
4‑way valve is OK. Return to the
troubleshooting of the specific error
and continue with the next procedure.
No
Replace the body of the 4‑way valve,
see
When outdoor temperature does not allow the unit to run in cooling or heating
mode
INFORMATION
Follow this procedure when the outdoor temperature is outside the temperature
range for one of the operation modes (
Heating
or
Cooling
). The unit CANNOT
operate in the mode for which the outdoor temperature is outside its temperature
range. See the databook on Business Portal for the temperature range of the
operation modes.
1
With the unit operating, connect the service monitoring tool to the unit and
check whether the unit is operating in
Heating
or
Cooling
mode.
2
Check with a contact thermometer (or by touching) if the flow through the 4-
way valve corresponds with the flow shown in the flow diagram of the specific
operation mode. (See
242]).
INFORMATION
The flow through the 4-way valve is correct if the water temperature after the heat
exchanger rises/drops when operating in
Heating
/
Cooling
mode.
Is the flow correct?
Action
Yes
4‑way valve is OK. Return to the
troubleshooting of the specific error
and continue with the next procedure.
No
Perform the next step of this procedure.
3
Connect a manifold to one of the service ports of the refrigerant circuit and
check the pressure (suction, discharge). Compare with normal operation
conditions of the unit.
Refrigerant pressure correct?
Action
Yes
Replace the body of the 4‑way valve,
see
No
Leaks may be found in the refrigerant
circuit. Perform a pressure test of the
refrigerant circuit, see
211].
4.1.2 Repair procedures
To remove the 4-way valve coil
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
Summary of Contents for RXTA30B2V1B
Page 262: ......
Page 263: ......
Page 264: ...ESIE21 12A 2022 02 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...