
Connecting the Receiver to Other Equipment
15
5
Apply power by connecting the receiver to a power outlet. The message
“Application Starting” will appear on the front panel. The boot process
approximately 1 minute for the unit to initialize. When ready, the front panel
display shows the startup screen.
6
The Ethernet Management port supports the following network protocols:
Telnet, SSHv2, HTTP, HTTPS, SNMPv2, Syslog/DTX, SNTP, FTP (client side),
TFTP, and MPEGoIP output (D9854 only).
7
Connect the HD-SDI outputs (M1 and M2) to HD compatible signal processing
equipment or HD signal monitoring equipment, if applicable.
Maintenance of EMC Compliance
The power cord (consisting of appliance coupler, flexible cord, and plug) supplied
with this product meets the requirements for use in the country for which this
product was purchased. In general, the power cord must be approved by an
acceptable, accredited agency responsible for evaluation in the country where the
product will be used.
Double-shielded (braid/foil or braid/braid) cables should be used for all ASI I/O
and RF inputs. Single-shield cables are acceptable for all other inputs and outputs.
For terminal block (Alarms) I/O, no shielding is required.
Summary of Contents for D9854
Page 21: ...Declaration of Conformity 410 Index 411 ...
Page 22: ......
Page 24: ......
Page 28: ...Chapter 1 Introduction 4 SCTE 104 pass through support on SDI output NIT Retune Recovery ...
Page 36: ......
Page 48: ......
Page 66: ......
Page 180: ......
Page 328: ......
Page 392: ......
Page 394: ......
Page 412: ......
Page 434: ...Appendix C Compliance 410 Declarationof Conformity ...
Page 439: ......