
Installation
Installing the Cover
2-33
Installing the Cover
2
If you have a 5-slot carrier, it is important to install the cover to keep the modules dust-free and
properly seated, and the system working efficiently.
If you have a 5-slot carrier with a Release 4.0 or later system, install the cover by following these
steps:
1.
Position the carrier cover over the modules so that the openings on the top of the carrier cover
align correctly with the tabs at the top of the installed 5-slot carrier and modules.
2.
Rotate the carrier cover into position so that it aligns correctly with the thumb screw opening
on the bottom of the carrier.
3.
Tighten the thumb screw. To ensure proper alignment and safe operation, tighten the thumb
screw securely.
Installing Telephones
2
After you have installed the control unit and have connected the line and extension cords, you are
ready to install the telephones. Installing the telephones includes assembling, connecting, and
testing the telephone. As desired, you also can connect an Intercom Autodialer to certain
telephones.
Assembling PARTNER Telephones
2
All PARTNER telephones are shipped with a stand for either desk-mounting or wall-mounting the
telephone. For other telephones, see the instructions that are provided with the telephone.
If you have a 5-slot carrier with a Release 3.0 or
earlier system, install the cover by following these
steps (see
):
Figure 2-25. Installing the Cover
1.
To cover the modules, grasp the upper edges of
the cover and hold it squarely over the control
unit.
2.
Place the cover over the modules and make
sure it fits firmly in place.
3.
Insert the #6 screw into the tab on the lower
front of the cover. Tighten the screw.
Summary of Contents for programming and use
Page 10: ...PARTNER Advanced Communications System Installation Programming and Use viii Master TOC...
Page 12: ...PARTNER Advanced Communications System Installation Programming and Use 1 ii...
Page 30: ...PARTNER Advanced Communications System Installation Programming and Use System Components 1 18...
Page 32: ...PARTNER Advanced Communications System Installation Programming and Use 2 ii...
Page 74: ...PARTNER Advanced Communications System Installation Programming and Use 3 ii...
Page 170: ...PARTNER Advanced Communications System Installation Programming and Use 5 ii...
Page 178: ...PARTNER Advanced Communications System Installation Programming and Use 6 ii...
Page 210: ...PARTNER Advanced Communications System Installation Programming and Use Handling Calls 6 32...
Page 212: ...PARTNER Advanced Communications System Installation Programming and Use 7 ii...
Page 366: ...PARTNER Advanced Communications System Installation Programming and Use 10 ii...
Page 390: ...PARTNER Advanced Communications System Installation Programming and Use 11 iv...
Page 430: ...PARTNER Advanced Communications System Installation Programming and Use A 10...
Page 436: ...PARTNER Advanced Communications System Installation Programming and Use Speed Dial Form C 4...
Page 440: ...PARTNER Advanced Communications System Installation Programming and Use Overview D 4...
Page 468: ...PARTNER Advanced Communications System Installation Programming and Use IN 14...