
Installation
Installing the Control Unit
2-11
Grounding the System
2
Inserting Batteries in the Processor Module
2
The processor module uses two AAA-size standard alkaline batteries to guard against the loss of
system programming in case of a power failure for 45 days to six months, depending on the
freshness of the batteries. You should replace the batteries every year.
CAUTION:
Batteries and battery cover are packaged in a separate box. If you are replacing batteries,
the old batteries must be removed with the power on or the system’s memory will be lost.
You ground the system by running a solid copper wire from the processor module to an
appropriate earth ground. Follow these steps to ground the system:
1.
Attach one end of a #12 AWG or #14 AWG solid
copper wire to the grounding screw on the
processor module (see
). The length
of the wire must not exceed 35 feet (7.6 meters).
2.
Route the wire through the wire manager on the
front of the module.
3.
Attach the other end of the wire to the approved
earth ground, such as building steel or a cold
water pipe.
Figure 2-12. Grounding Screw
In Release 4.0 and later systems, the configuration of the 1600 DSL module is not
backed up to the PCMCIA card. Instead, the configuration is retained in the flash memory
of the 1600 DSL module.
PARTNER
3000
Summary of Contents for programming and use
Page 10: ...PARTNER Advanced Communications System Installation Programming and Use viii Master TOC...
Page 12: ...PARTNER Advanced Communications System Installation Programming and Use 1 ii...
Page 30: ...PARTNER Advanced Communications System Installation Programming and Use System Components 1 18...
Page 32: ...PARTNER Advanced Communications System Installation Programming and Use 2 ii...
Page 74: ...PARTNER Advanced Communications System Installation Programming and Use 3 ii...
Page 170: ...PARTNER Advanced Communications System Installation Programming and Use 5 ii...
Page 178: ...PARTNER Advanced Communications System Installation Programming and Use 6 ii...
Page 210: ...PARTNER Advanced Communications System Installation Programming and Use Handling Calls 6 32...
Page 212: ...PARTNER Advanced Communications System Installation Programming and Use 7 ii...
Page 366: ...PARTNER Advanced Communications System Installation Programming and Use 10 ii...
Page 390: ...PARTNER Advanced Communications System Installation Programming and Use 11 iv...
Page 430: ...PARTNER Advanced Communications System Installation Programming and Use A 10...
Page 436: ...PARTNER Advanced Communications System Installation Programming and Use Speed Dial Form C 4...
Page 440: ...PARTNER Advanced Communications System Installation Programming and Use Overview D 4...
Page 468: ...PARTNER Advanced Communications System Installation Programming and Use IN 14...