
PARTNER
®
Advanced Communications System Installation, Programming, and Use
Installing the Control Unit
2-14
4.
Press the power cord firmly into the power jack on
the carrier or the stand-alone processor module
until the cord locks into place (see
).
5.
Plug the other end of the power cord into a
properly grounded three-prong wall outlet that is
not controlled by a switch.
6.
If you have a 5-slot carrier, move the On/Off
switch to the On (“—”) position.
CAUTION:
The power cord should hang straight down from
the connector for the entire length of the module
or carrier. Do not install the power cord at an
angle to the case or with a loop in it.
7.
If this is the initial installation for a Release 3.0
system, follow these additional steps:
a.
Check the LEDs to make sure that the
processor is on steady green for at least
15 seconds.
b.
Press
f00ss#
989
at extension 10 or 11.
c.
Press
25327
.
The system resets. You may proceed with
the rest of the installation upon
completion of the reset (about 20
seconds).
Figure 2-16. Attaching the Power
Cord
Stand-Alone
2-Slot
5-Slot
Summary of Contents for programming and use
Page 10: ...PARTNER Advanced Communications System Installation Programming and Use viii Master TOC...
Page 12: ...PARTNER Advanced Communications System Installation Programming and Use 1 ii...
Page 30: ...PARTNER Advanced Communications System Installation Programming and Use System Components 1 18...
Page 32: ...PARTNER Advanced Communications System Installation Programming and Use 2 ii...
Page 74: ...PARTNER Advanced Communications System Installation Programming and Use 3 ii...
Page 170: ...PARTNER Advanced Communications System Installation Programming and Use 5 ii...
Page 178: ...PARTNER Advanced Communications System Installation Programming and Use 6 ii...
Page 210: ...PARTNER Advanced Communications System Installation Programming and Use Handling Calls 6 32...
Page 212: ...PARTNER Advanced Communications System Installation Programming and Use 7 ii...
Page 366: ...PARTNER Advanced Communications System Installation Programming and Use 10 ii...
Page 390: ...PARTNER Advanced Communications System Installation Programming and Use 11 iv...
Page 430: ...PARTNER Advanced Communications System Installation Programming and Use A 10...
Page 436: ...PARTNER Advanced Communications System Installation Programming and Use Speed Dial Form C 4...
Page 440: ...PARTNER Advanced Communications System Installation Programming and Use Overview D 4...
Page 468: ...PARTNER Advanced Communications System Installation Programming and Use IN 14...