
7.2 Performance Test for Error Detector
7-19
7
Performance T
est
7.2.4
Maximum input level and patterns
(1) Specification
800 mVp-p
BER 10
–
12
or less under the following conditions:
Bit
rate:
When MP2110A-093 is not installed: 24.3 to 28.2 Gbit/s
When MP2110A-093 is installed:
9.5 to 28.2 Gbit/s
Pattern:
PRBS31, PRBS23, PRBS15, PRBS9, PRBS7
Mark
ratio: 50%
Single-end
Back-to-back
connection
(2) Setup
Figure 7.2.4-1 ED1 Data In Pattern Test Connection Diagram
Figure 7.2.4-2 ED1
Data In Pattern Test Connection Diagram
(3) Procedure
1. Connect coaxial terminators to the
PPG1
Data
Out
and
ED1
Data
In
connectors. (Refer to Figure 7.2.4-1.)
2. Connect
the
PPG1 Data Out
and
ED1 Data In
connectors using a
coaxial cable.
Coaxial Terminator
Coaxial Terminator
Summary of Contents for BERTWave Series
Page 26: ...VI...
Page 74: ...Chapter 1 Outline 1 48...
Page 166: ...Chapter 4 Screen Operation 4 24...
Page 210: ...Chapter 6 How to Operate Sampling Scope 6 16 Figure 6 2 2 4 Switching Graph Display...
Page 309: ...6 9 Measuring Waveform 6 115 6 How to Operate Sampling Scope Figure 6 9 5 1 Marker Display...
Page 322: ...Chapter 6 How to Operate Sampling Scope 6 128...
Page 380: ...Chapter 8 Maintenance 8 14 7 Click Reinstall Windows 8 Click Yes...
Page 432: ...Appendix A Specifications A 36...
Page 458: ...Appendix D Performance Test Record Form D 12...
Page 466: ...Index Index 6...