
2.10 Precautions for Preventing Damage
2-37
2
B
ef
or
e U
se
Measurement Preparation 2:
1. Set the MP2110A output to OFF.
2. Set the DC power supply output to OFF.
3. Disconnect the MP2110A and all equipment, or change the DUT
connections.
Since even unforeseen fluctuations in DC voltage and load (open or short
circuits at the MP2110A output side and changes caused by using a
high-frequency probe, etc.) can damage the DUT and the MP2110A, we
recommend connecting a 50
Ω
resistance in series with the DC terminal of
the Bias-T to prevent risk of damage.
Summary of Contents for BERTWave Series
Page 26: ...VI...
Page 74: ...Chapter 1 Outline 1 48...
Page 166: ...Chapter 4 Screen Operation 4 24...
Page 210: ...Chapter 6 How to Operate Sampling Scope 6 16 Figure 6 2 2 4 Switching Graph Display...
Page 309: ...6 9 Measuring Waveform 6 115 6 How to Operate Sampling Scope Figure 6 9 5 1 Marker Display...
Page 322: ...Chapter 6 How to Operate Sampling Scope 6 128...
Page 380: ...Chapter 8 Maintenance 8 14 7 Click Reinstall Windows 8 Click Yes...
Page 432: ...Appendix A Specifications A 36...
Page 458: ...Appendix D Performance Test Record Form D 12...
Page 466: ...Index Index 6...