
84
ML-2350A/2351A
1. Setting Welding Schedules
(2) Press the "POWER [%]" setting button of "POINT 01."
Enter the laser output value (%).
Set the ratio to "PEAK POWER" set on the SCHEDULE screen in the range of 0
to 150.0%.
(3) Likewise, set "SHOT [COUNT]" and "POWER [%]" of "POINT 02" to "POINT 06."
⇒
For "POINT 06", press the
button to scroll the POINT display column to the
right. Then, it is displayed.
<Note>
If the output count set in "SHOT" is smaller than that set in "SHOT [COUNT]", any
larger output count set in "SHOT [COUNT]" is invalidated.
When the output count set in "SHOT" is larger than that set in "SHOT [COUNT]",
the POWER of the final set value in "SHOT [COUNT]" is repeated until the output
count reaches the output count set in "SHOT."
For example, supposing that "SHOT" is set to 40, up to 40 shots are also validated
for "SHOT [COUNT]." (Up to 0040 of POINT 03 on the above screen) When
"SHOT" is set to 200, the POWER of the final set value is repeated up to 101 to 200
shots for "SHOT [COUNT]." (In this case, the 20% energy of POINT 06 is repeated
up to 101 to 200 shots.)
(4) Press the "SCHED" button to return to the SCHEDULE screen.
3
Enabling the Fade Function
(1) Press the "SEAM" setting button on the SCHEDULE screen to set it to ON.
The fade-in/out function for seam welding is enabled.
⇒
When the fade-in/out function is not used, keep the "SEAM" setting button OFF.
(%) (POWER)
10 40 50 90 100
(SHOT)
150
100
50
0
Summary of Contents for ML-2350A-CE
Page 1: ...AA06OM1173714 18 OPERATION MANUAL YAG LASER WELDER ML CE 2350A 2351A Original instructions...
Page 19: ...Introduction Part...
Page 20: ......
Page 37: ...Installation and Preparation Part...
Page 38: ......
Page 46: ......
Page 57: ...Operating Part...
Page 58: ......
Page 118: ......
Page 128: ......
Page 150: ......
Page 174: ......
Page 179: ...Maintenance Part...
Page 180: ......
Page 209: ...Appendixes...
Page 210: ......