
3. Maintenance of Laser Oscillator Section
197
ML-2350A/2351A
Chapter 1 How to Perform Maintenance
Introduction Part
Operating Part
Maintenance Part
Appendixes
Installation
and
Preparation
Part
2
Installing a New Flashlamp
(1) Wipe a new flashlamp with alcohol and pass it through the flowtube.
(2) Adjusting the polarity of the flashlamp to the + sign printed on the laser chamber,
return the flashlamp slowly into the laser chamber.
⇒
Check the polarity of the flashlamp. The red painted electrode is the positive
side.
⇒
When returning the flashlamp into the laser chamber, set the lamp-side fixture
correctly in the chamber-side fixture.
(3) Tighten the bolts on both ends of the flashlamp to fix the flashlamp.
⇒
Tighten the positive side and the negative side little by little alternately with a
tightening torque of 60 cN•m (6 kgf•cm).
(4) Put the top part of the reflector slowly.
(5) Wipe off the waterdrops attached on the rear side of the top lid of the laser
chamber, and then install the top lid of the laser chamber.
⇒
Tighten the 4 bolts with the standard tightening torque of 500 cN•m (50 kgf•cm).
⇒
If water leakage occurs during an operation check, tighten the 4 bolts within the
maximum tightening torque of 550 cN•m (55 kgf•cm) and the make sure that no
leakage occurs. At this time, the packings between the top lid and the chamber
are equally pressurized.
"+" side
"+" side
Lamp-fixing bolt
Summary of Contents for ML-2350A-CE
Page 1: ...AA06OM1173714 18 OPERATION MANUAL YAG LASER WELDER ML CE 2350A 2351A Original instructions...
Page 19: ...Introduction Part...
Page 20: ......
Page 37: ...Installation and Preparation Part...
Page 38: ......
Page 46: ......
Page 57: ...Operating Part...
Page 58: ......
Page 118: ......
Page 128: ......
Page 150: ......
Page 174: ......
Page 179: ...Maintenance Part...
Page 180: ......
Page 209: ...Appendixes...
Page 210: ......