
4. Maintenance of the Power Supply Section
201
ML-2350A/2351A
Chapter 1 How to Perform Maintenance
Introduction Part
Operating Part
Maintenance Part
Appendixes
Installation
and
Preparation
Part
4. Maintenance of the Power Supply Section
Replacing the Lithium Battery for Backup
Replace the lithium battery for backup provided on the CPU board in the main unit.
The service life of the battery is about 3 years. Replace it within 3 years.
ATTENTION
Follow your local environmental regulations for battery disposal because Lithium
Battery contains dangerous materials.
Item required
Phillips screwdriver and lithium battery CR2450
⇒
At battery replacement, the registered output schedule data may be lost. We
recommend recording the data into the attached output schedule data entry table
before replacement.
Operating Procedure
(1) Turn OFF the MAIN POWER switch and wait for 5 minutes or more.
(2) Remove the left side cover as viewed from the front side.
(3) Remove the battery on the CPU board and install a new battery instead.
⇒
Set the battery minding the polarity.
(4) Install the side cover.
Remove the screws of the side cover, raise
the cover, and then pull it out forward.
Battery
Summary of Contents for ML-2350A-CE
Page 1: ...AA06OM1173714 18 OPERATION MANUAL YAG LASER WELDER ML CE 2350A 2351A Original instructions...
Page 19: ...Introduction Part...
Page 20: ......
Page 37: ...Installation and Preparation Part...
Page 38: ......
Page 46: ......
Page 57: ...Operating Part...
Page 58: ......
Page 118: ......
Page 128: ......
Page 150: ......
Page 174: ......
Page 179: ...Maintenance Part...
Page 180: ......
Page 209: ...Appendixes...
Page 210: ......