
2. Maintenance of the Cooler Unit Section
189
ML-2350A/2351A
Chapter 1 How to Perform Maintenance
Introduction Part
Operating Part
Maintenance Part
Appendixes
Installation
and
Preparation
Part
(4) Remove the cap of the ion-exchanger and discard the used ion-exchange resin.
⇒
Dispose of the used ion-exchange resin together as plastic waste.
2
Mounting a New Ion-Exchange Resin
(1) Put a new ion-exchange resin into the ion-exchanger and set the cap as it was.
<Notes>
- If the ion-exchange resin is left in the air, it will be deteriorated. Immediately
after the package is opened, put the ion-exchange resin into the ion-exchanger
and return (dip) it into the cooling water tank.
- Take care not to spill the ion-exchange resin. Wipe off the ion-exchange resin
attached on the mouth of the ion-exchanger.
Plastic
waste
Cap
Ion-exchanger
If the resin is attached on the
outside of the ion-exchanger,
wipe it off completely.
Put the bag mouth into the ion-
exchanger so as not to spill the resin.
Cross-recessed head
machine screw with
washer (Be sure to
use the attached
screws.)
Cross-recessed head machine
screw with washer (M4, 16mm
in length, material SUS)
Remove the 4 cross-
recessed head machine
screws with washer and
pull the cap upward.
Discard the used ion-
exchange resin.
Summary of Contents for ML-2350A-CE
Page 1: ...AA06OM1173714 18 OPERATION MANUAL YAG LASER WELDER ML CE 2350A 2351A Original instructions...
Page 19: ...Introduction Part...
Page 20: ......
Page 37: ...Installation and Preparation Part...
Page 38: ......
Page 46: ......
Page 57: ...Operating Part...
Page 58: ......
Page 118: ......
Page 128: ......
Page 150: ......
Page 174: ......
Page 179: ...Maintenance Part...
Page 180: ......
Page 209: ...Appendixes...
Page 210: ......