
1. Connecting the Power Supply
47
ML-2350A/2351A
Chapter 2 Connections and Preparations of Each Section
Introduction Part
Install
atio
n and
Preparati
on Part
Operating Part
Maintenance Part
Appendixes
Chapter 2
●
Connections and Preparations of
Each Section
1. Connecting the Power Supply
CAUTION
Your qualified electrician must carry out the electrical connection to main power
supply. (Also follow your local accident prevention regulations, such as the German
Regulation, BGVA2.)
CAUTION
For the power supply side, we earnestly recommend using a leakage breaker with
the rated current of 10 A or more, which is applicable to harmonics and surges.
Item required
Phillips screwdriver
Operating Procedure
(1) Open the front door and remove the plastic cover on the power input terminal
400 V AC.
(2) Lead the attached power cable inward from the hole on the bottom plate of the
main unit.
(3) While confirming the terminal colors of the power cable, connect the power cable
to the L1, L2, L3, and PE power input terminals.
Installation and
Preparation Part
When the front door is open
Power input terminals
Power
cable
BRN
BLU BLK
YEL/GRN
2.5 sq
M5
Summary of Contents for ML-2350A-CE
Page 1: ...AA06OM1173714 18 OPERATION MANUAL YAG LASER WELDER ML CE 2350A 2351A Original instructions...
Page 19: ...Introduction Part...
Page 20: ......
Page 37: ...Installation and Preparation Part...
Page 38: ......
Page 46: ......
Page 57: ...Operating Part...
Page 58: ......
Page 118: ......
Page 128: ......
Page 150: ......
Page 174: ......
Page 179: ...Maintenance Part...
Page 180: ......
Page 209: ...Appendixes...
Page 210: ......