Table 369:
Settings for configuration example 1
Setting name
Setting value
Shot number CBB1
1
Init signals CBB1
7 (lines 1, 2 and 3 = 1+2+4 = 7)
First reclose time
0.3s (an example)
Shot number CBB2
2
Init signals CBB2
7 (lines 1, 2 and 3 = 1+2+4 = 7)
Second reclose time
15.0s (an example)
Example 2
There are two separate sequences implemented with three shots. Shot 1 is implemented by
CBB1 and it is initiated with the high stage of the overcurrent protection (50P-1). Shot 1
is set as a high-speed autoreclosing with a short time delay. Shot 2 is implemented with
CBB2 and meant to be the first shot of the autoreclose sequence initiated by the low stage
of the overcurrent protection (51P) and the low stage of the non-directional ground-fault
protection (51N/G). It has the same reclose time in both situations. It is set as a high-speed
autoreclosing for corresponding faults. The third shot, which is the second shot in the
autoreclose sequence initiated by 51P or 51N/G, is set as a delayed autoreclosing and
executed after an unsuccessful high-speed autoreclosing of a corresponding sequence.
Section 9
1MRS240050-IB C
Control functions
486
REF615R
Technical Manual
Summary of Contents for RELION REF615R
Page 1: ... RELION PROTECTION AND CONTROL REF615R Technical Manual ...
Page 2: ......
Page 27: ...Section 18 Glossary 653 Table of contents REF615R 21 Technical Manual ...
Page 28: ...22 ...
Page 36: ...30 ...
Page 46: ...40 ...
Page 115: ...3 15 4 Settings 1MRS240050 IB C Section 3 Basic functions REF615R 109 Technical Manual ...
Page 118: ...112 ...
Page 318: ...312 ...
Page 388: ...382 ...
Page 456: ...450 ...
Page 520: ...514 ...
Page 652: ...646 ...
Page 656: ...650 ...
Page 658: ...652 ...
Page 663: ...657 ...