7
© 2012-2013 TOSHIBA TEC CORPORATION All rights reserved
e-STUDIO2555C/3055C/3555C/4555C/5055C
PREVENTIVE MAINTENANCE (PM)
7 - 41
7.11
Machine Refreshing Checklist
Symbols/value used in the checklist
Notes:
•
When performing machine refreshment, check the items in the preventive maintenance checklist
in addition to the items in the machine refreshing checklist.
•
Perform cleaning and lubricating in the following timing. Lubricate the replacement parts
according to the replacement cycle.
•
The value in the “Replacement” field of the table below indicates the replacement number of
output pages in either the black or the full color mode.
•
The replacement cycle of the parts in the feeding section equals to the number of sheets fed from
each paper source.
•
Be careful not to put oil on the rollers, belts and belt pulleys when lubricating.
•
Parts list <P-I> represents the page item in “e-STUDIO2555C/3055C/3555C/4555C/5055C
Service Parts List”.
Item
Description
Cleaning
A:
Clean with alcohol
B:
Clean with soft pad, cloth or vacuum cleaner
Lubrication/
Coating
W1:
White grease (Molykote EM-30L)
W2:
White grease (Molykote HP-300)
Replacement
Value:
Replacement cycle
R1:
Replacement
R2:
For preventive maintenance, check if the parts are damaged and replace
them as required. If the parts are not replaced at the machine refreshing
interval, inspect them at the subsequent PM.
R3:
Replace if deformed or damaged. If the parts are not replaced at the
machine refreshing interval, inspect them at the subsequent PM.
R4:
Lubrication recommended: If the parts are not lubricated at the machine
refreshing interval, inspect their lubrication status at the subsequent PM.
Operation check
O:
After cleaning or replacement, confirm there is no problem.
Model
Replacement cycle
25ppm
450,000 sheets
30ppm
540,000 sheets
35ppm
630,000 sheets
45ppm
680,400 sheets
50ppm
756,000 sheets
Items to check
Cleaning
Lubrication/
Coating
Replacement
Operation
check
Parts
list
<P-I>
(x 1,000
sheets)
(x 1,000
drive
counts)
1
Paper feeding drive unit
W1
R4
R4
-
2
Drum TBU drive unit
W1
R4
R4
-
3
Development drive unit
W1
R4
R4
-
4
Fuser unit drive gear
W1
R4
R4
-
5
Gear of registration
motor
W1
R4
R4
46-1
D1
ADU transport roller
W1
R4
R4
41-10
E2
Bypass separation roller
W2
R4
R4
21-24
J1
Transfer belt *
A
R2
R2
26-14
Содержание e-studio 2555c
Страница 6: ......
Страница 10: ......
Страница 24: ...e STUDIO2555C 3055C 3555C 4555C 5055C 2012 2013 TOSHIBA TEC CORPORATION All rights reserved FEATURE 1 2 ...
Страница 426: ...e STUDIO2555C 3055C 3555C 4555C 5055C 2012 2013 TOSHIBA TEC CORPORATION All rights reserved SELF DIAGNOSTIC MODE 5 60 ...
Страница 1008: ...e STUDIO2555C 3055C 3555C 4555C 5055C 2012 2013 TOSHIBA TEC CORPORATION All rights reserved FIRMWARE UPDATING 11 24 Fig 11 14 ...
Страница 1024: ...e STUDIO2555C 3055C 3555C 4555C 5055C 2012 2013 TOSHIBA TEC CORPORATION All rights reserved FIRMWARE UPDATING 11 40 ...
Страница 1038: ...e STUDIO2555C 3055C 3555C 4555C 5055C 2012 2013 TOSHIBA TEC CORPORATION All rights reserved BACKUP FUNCTION 12 14 ...
Страница 1044: ...e STUDIO2555C 3055C 3555C 4555C 5055C 2012 2013 TOSHIBA TEC CORPORATION All rights reserved EXTERNAL COUNTERS 13 6 ...
Страница 1550: ......
Страница 1557: ......
Страница 1558: ...1 11 1 OSAKI SHINAGAWA KU TOKYO 141 8562 JAPAN ...