Installing and Plumbing the Columns and Suppressor
Doc. 031857-03 4/06
B-23
B.9
Installing and Plumbing the Columns and Suppressor
NOTE This section provides brief installation and plumbing
instructions for the columns and suppressor. Before
beginning the installation, refer to the column and
suppressor manuals for detailed start-up and
installation instructions. The manuals are provided on
the Dionex Reference Library CD-ROM (P/N 053891).
Before beginning:
•
Remove the guard column, separator column, and suppressor from their
boxes.
•
Remove the fitting plugs from the ends of each column and from all ports on
the suppressor.
•
Discard any tubing temporarily connecting the suppressor ports.
B.9.1
Setting Up the Column Heater
1. Cut off the two
shipping ties from
the column heater
and remove them
(see
2. Loosen the two
thumbscrews on
the heater cover
(they remain
attached to the
cover).
3. Pull the heater
cover straight out
to remove it.
Figure B-20. ICS-2000 Column Heater Setup
Thumbscrew (2)
Shipping Tie (2)
Содержание Dionex ICS-2000
Страница 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Страница 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Страница 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Страница 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Страница 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Страница 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...