Setting Up the Eluent Generator
Doc. 031857-03 4/06
B-79
Items Required to Complete the Setup Procedure
In addition to the EluGen cartridge and the EGC CO
3
Mixer, you will
need the following items to complete the eluent generator setup. Except
as noted, all items are supplied in the ICS-2000 Ship Kit (P/N 064375).
Item
P/N
Use To
Yellow 0.5 mL/min, 7 MPa
(1000 psi) backpressure coil
053765
Provide backpressure during
setup procedures
EluGen Cartridge Vent Line
Tubing Kit (supplied with the
cartridge)
063092
Vent the cartridge during
operation
EGC CO
3
Mixer mounting
clips
063642
Install the mixer
Phillips head screwdriver (not
supplied)
n/a
Install the EGC CO
3
Mixer
mounting clips
35 cm (14 in) of black
0.25-mm (0.010-in) ID PEEK
tubing
064346
Connect the EGC degas eluent
outlet and the EGC CO
3
Mixer
inlet
60 cm (24 in) of black
0.25-mm (0.010-in) ID PEEK
tubing
064343
Connect the EGC CO
3
Mixer
outlet to port
P
(
2
) on the
injection valve
Temporary waste container
(beaker, bottle, etc.) (not
supplied)
n/a
Collect waste during setup
procedures
10-32 fittings
10-32 ferrules
043275
043276
Complete the plumbing
connections
1/8-in fittings
1/8-in ferrules
052267
048949
Complete the plumbing
connections
10-32 to 10-32 couplers
042627
Complete the plumbing
connections
Содержание Dionex ICS-2000
Страница 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Страница 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Страница 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Страница 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Страница 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Страница 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...