ICS-2000 Ion Chromatography System
B-76
Doc. 031857-03 4/06
Completing the Eluent Generator Setup for Carbonate/Bicarbonate
Eluent
illustrates the liquid flow path through the ICS-2000 after all
setup steps are complete and the eluent generator is ready for operation.
Figure B-74. ICS-2000 Flow Schematic: Carbonate/Bicarbonate Eluent Generation
E
luent In
Re
gen In
R
egen Out
E
luent
Out
L
L
S
W
P
C
EPM
Eluent In
Eluent Out
Regen Out
Regen In
To the pump Degas In
Cell In
Cell Out
Column
Heater
Suppressor
H
eat
E
xch
anger
Degas Out
Pulse Damper
Valve
EGC
Degas
Degas In
To waste
Eluent
Valve
EGC II
K
2
CO
3
Inlet
Outlet
To Gas
Separator
Assembly
Conductivity
Cell
Sample in
Back-
pressure
Coil
To waste
Deionized
Water
Press.
Xducer.
Pump
Head
Pump
Head
Gua
rd
Se
p
a
rator
EGC
C
O
3
Mixer
EGC Vent
Содержание Dionex ICS-2000
Страница 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Страница 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Страница 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Страница 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Страница 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Страница 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...