5 • Service
Doc. 031857-03 4/06
5-87
8. Turn the EGC holder right side up and set it in place on top of the
ICS-2000.
9. Slide the EPM mounting bracket and connected EPM onto the side of
the EGC holder.
10. Feed the following liquid lines through the tubing chase to the ICS-
2000 front component panel.
•
TO SRS/AES REGEN OUT
•
TO INJ VALVE IN - P/ELUENT OUT
•
TO PUMP/DAMPER
11. Connect the lines to their respective locations:
•
Connect the line labeled
TO SRS/AES REGEN OUT
to the
REGEN
OUT
port on the suppressor.
•
Connect the line labeled
TO INJ VALVE IN - P/ELUENT OUT
to the
EGC CO
3
Mixer inlet.
•
Connect the line labeled
TO PUMP/DAMPER
to the pulse damper.
12. Direct the
WASTE, GAS SEPARATOR
line from the top of the ICS-
2000 to the rear panel. Snap the line onto one of the tubing clips on
the rear panel. Connect the line to the gas separator waste tube (see
13. Go on to
5.21.4 Installing the New EGC Holder without a CR-TC or EPM
Follow the instructions in this section if a CR-TC or EPM is not installed.
1. Set the new EGC holder in place on top of the ICS-2000.
2. Feed the following liquid lines through the tubing chase to the ICS-
2000 front component panel.
•
TO SRS/AES REGEN OUT
•
TO INJ VALVE IN - P/ELUENT OUT
•
TO PUMP/DAMPER
3. Connect the lines to their respective locations:
•
Connect the line labeled
TO SRS/AES REGEN OUT
to the
REGEN
OUT
port on the suppressor.
Содержание Dionex ICS-2000
Страница 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Страница 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Страница 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Страница 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Страница 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Страница 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...