5 • Service
Doc. 031857-03 4/06
5-77
Filling the EGC CO
3
Mixer with Carbonate/Bicarbonate Eluent
illustrates the liquid flow path through the eluent generator
components during initial filling of the EGC CO
3
Mixer with
carbonate/bicarbonate eluent.
Figure 5-66. Plumbing for Initial Filling of the EGC CO
3
Mixer with
Carbonate/Bicarbonate
EGC
IN
TO DEGAS
ELUENT OUT
WASTE,
GAS
SEPARATOR
TO INJ
VALVE IN - P/
ELUENT OUT
TO DEGAS
ELUENT IN
EGC
DEGAS
Connect to
Gas Separator
Assembly
Pre-plumbed
Pump Pulse
Damper
to
EGC CO
Mixer
3
TO CR-TC/EPM
REGEN IN
(orange)
TO PUMP/
DAMPER
TO CR-TC/EPM
ELUENT OUT
(yellow)
TO
C
R-
TC
/E
PM
RE
GE
N
OU
T
(b
lue
)
EPM
E
L
UENT
I
N
T
O
C
R
-TC
/E
P
M
E
L
U
E
N
T
IN
(r
ed
)
EGC
OUT
(yellow)
(blue)
(red)
TO EGC CO3
MIXER IN
TO INJ VALVE
PORT P
TO EGC CO3
MIXER OUT
TO SRS/AES
REGEN OUT
Back-
Pressure
Coil*
*
14 MPa (2000 psi)
at 1.0 mL/min
From the EluGen
cartridge outlet port
To the EluGen
cartridge inlet port
Содержание Dionex ICS-2000
Страница 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Страница 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Страница 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Страница 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Страница 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Страница 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...