ICS-2000 Ion Chromatography System
5-48
Doc. 031857-03 4/06
5.17.2 Replacing a K
2
CO
3
Cartridge
1. Turn off the pump from the ICS-2000 Control panel in Chromeleon
or from the ICS-2000 touch screen
HOME
page.
2. Disconnect the EluGen cartridge cable from the
EGC-1
connector on
the ICS-2000 top cover.
3. If an EPM is installed, disconnect the EPM cable from the
EGC-2
connector.
4. Remove the EluGen
cartridge
VENT
line
from the EluGen
cartridge by
unscrewing the luer
lock from the luer
adapter.
If necessary, use a
wrench to hold the
luer adapter in place
while unscrewing
the vent line.
Figure 5-42. EluGen Cartridge Vent Line and Luer Fitting
5. Install the luer cap (P/N 053981), provided with the EluGen cartridge,
onto the luer adapter. This prevents leaks from the vent opening when
you turn over the EluGen cartridge (see Step 7).
6. Lift the EluGen cartridge straight up and out of the cartridge holder.
Luer Lock
Luer Adapter
EGC
Vent
Line
Содержание Dionex ICS-2000
Страница 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Страница 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Страница 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Страница 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Страница 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Страница 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...