Priming the Pump
Doc. 031857-03 4/06
B-33
5. Touch
PUMP
to open the touch screen
PUMP
page (see
Under
Eluent Valve
, touch the
Open
button.
6. Draw the syringe back to begin pulling eluent through the flow path.
It may take several syringe draws to remove all air or previous eluent
from the tubing. Draw out a minimum of 20 mL of eluent to ensure
that the vacuum degas assembly is primed.
7. After priming the lines thoroughly, close the priming valve.
Do not
overtighten the priming valve.
8. Touch
Eluent Valve Closed
on the touch screen
PUMP
page.
Figure B-28. Pump Page: Eluent Valve Open
Содержание Dionex ICS-2000
Страница 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Страница 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Страница 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Страница 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Страница 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Страница 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...