background image

D

 

G
 

In

 

FM Marin 

Ljungåsväg
302 91  Ha
Sweden 
 

Be

Qu

In

ocument rele

obius, Wa

nstallation

AB 

gen 2 

almstad 

efore you be

1.

 

Please

1 cont

for th

instru

2.

 

Deter

place 

3.

 

Deter

batter

uick installa

 

Attach

 

Conne

 

Start G

 

Chang

 

Calibr

 

Contr

 

Test a

 

Plug i

nstalling the

1.

 

Decid

install

You m

standa

2.

 

We su

to pla

should

templ

3.

 

Use th

4.

 

Conn

conne

correc

descri

5.

 

If you

Wema

the co

ease 3.97, Ap

aste Holdi

n Guide

 

 
 
 
 

egin 

e make sure 

trol unit (09

he control un

uction on ho

rmine the be

the sensors 

rmine the be

ry 12/24 Vo

ation 

h the sensor

ect all parts 

Gobius 
ge the defau

rate when th

rol the new s
and run Gob

 

n to externa

 

e panel and 

de where to p

led in your h

may increase

ard PC netw

uggest that y

ce the cable

d be at least

late at page 5

he pre-attach

ect the pane

ect the cable

ctly to the b

ibed on the 

u want to co

a, Faria or o

ontrol unit to

ril 2014

 

ing Tanks

that no part

91427), 1 3M

nit, cables, w

ow to attach 

est places (¼

and where t

est way to sa

olts.  

rs to the tan

ult settings 

he tank is em

settings 

bius 

al instrumen

connecting

place the Go

head/showe

e the length 

work Cat 5 c

you make a s

e from the p

t

 

4 mm x 22 

5. 

hed adhesiv

el and the se

es to the batt

attery (

+

 is w

control unit

nnect Gobiu

others, you s

ogether with

, version 3

Ph
E-m
ww

t is missing. 

M cleaning to

warranty stat

the sensors

¼-, ½- and ¾

to place the 

afely access e

mpty 

nt , lamp or b

g the system

obius panel.

er or near yo

of the panel

cable. 

small rectan

anel to the c

mm. Please

ve to fasten t

ensors to the

tery. Make s

white and 

t. Please see 

us to an ext

hould use th

h the enclos

3.0 

hone +46 

31-

mail info@fm

ww.fmmarin.se

 

(3 sensors, 

owel, 1 Velc

tement and i

¾-level) on y

panel.  

electricity fr

buzzer 

. It can for i

our waste ho

l cable up to

gle hole whe

control unit.

e see the enc

the panel to 
e control un

sure to conn

is black), as

the illustrat

ernal display

he analogue 

ed cable.  

-65 01 70

mmarin.se 

1 panel, 

ro fastening

installation 

your tank to

rom your 

instance be 

olding tank. 

o 50 m with 

ere you wan

. The hole 

closed hole 

the wall. 

nit. Then 

nect + and –

s also 

tion at page 

y from VDO

output on 

 

nt 

– 

5. 

O, 

Содержание Gobius 4 Waste

Страница 1: ... est way to sa olts rs to the tan ult settings he tank is em settings bius al instrumen connecting place the Go head showe e the length work Cat 5 c you make a s e from the p t 4 mm x 22 5 hed adhesiv el and the se es to the batt attery is w control unit nnect Gobiu others you s ogether with version 3 Ph E m ww t is missing M cleaning to warranty stat the sensors and to place the afely access e k ...

Страница 2: ...he pow ng all lamps a press the ensors is car blue lamp and green l us has not y xt step blem with on ensor itself ng a steady l please see th efore proce does not funct mmarin se or by gs timized for y differences i connecting default setti are not in ac m You will fi by pressing ally flicks thr ase the butto ting Repeat 2 of Vaseline nected to the ted from da se contact F urthermore fuse documen...

Страница 3: ...n rnatives with g is corrected g tank materi turn off Go colour com will not hap e holding ta here are alwa order to com em before y tart by maki tallation the tank wait for the he button on as soon as tarts automa ght is on the ate on press the ts are on re on releas tarts automa ght is on the 3 e table of th n until the ch your choice a ade the chan ntil all alterna hout making d by repeatin ial...

Страница 4: ...e e the installa rks accordin ng Gobius o uick push on from an exte mediately per d the correct u may hear calculation presented b ht level a quick push external sour s and the cal to the power ented two active pa a vibration i vibration an en starts to c iquid level h tect liquid le hicknesses I due to possi ccording to t a maintena bius has man direct contac 4 trument as a page 7 you w oduct and...

Страница 5: ...will not dama me worn ou y consumpti not require tration ntrol unit to the panel wir e panel will co age the produc ut Another p ion which is any extra m o the panel re wrong way onstantly light ct 5 positive aspe s less than 4 maintenance the ht ect of Gobiu 40 mA 12 V Attach us is its Volts hing sensor rs to the tan nk ...

Страница 6: ...4 sen 1 2 sen No sen When c Gobius flashing light panel sho nation very s is not yet ca starting f the senso f the senso f the 3 4 sen measuring evel 0 evel 1 4 evel 1 2 evel 3 4 measuring is empty evel 1 4 evel 1 2 evel 3 4 r errors nsor not func nsor not func nsor not func nsor and 1 2 nsor and 3 4 nsor and 3 4 nsors function calibrating s is calibratin t ow alibrated or or sor ctioning ctioning...

Страница 7: ...n standard 180 Ω 23 Ω 68 Ω 12 Ω 58 Ω Descripti Calibratio Measurem Measurem Measurem Measurem installati Tank in p fibre glas Tank in p Tank in s Tank in s steel 2 3 Gauge 4 Gauge 10 Gauge 24 The setup without c nce d US 2 ion on ment period ment period ment period ment period on mode plastic 5 10 s 4 8 mm plastic 2 5 m stainless stee steel 2 3 m 3 mm alumi 20 mA In 0 180 Ω E 40 33 Ω U p mode will...

Страница 8: ...r Products in or on e 10 29 V nt 200 mA 40 mA m s e 29 V DC nt 200 mA nt s Industria Europea US stand e 29V DC Battery 12 24V ellow ed reen ack r choosing G egister your rder to receiv 8 V DC maximum O maximum Idl C al standard 4 n standard 10 dard 240 33 Ω y V Fuse 500 mA Gobius r Gobius pro ve free tech Operating le 20 mA curre 0 180 Ω Ω Ind 4 E s Blue Black oducts on hnical suppor ent loop Gaug...

Отзывы: