![Siemens IM 153-4 PN Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/siemens/im-153-4-pn/im-153-4-pn_operating-instructions-manual_377175025.webp)
Brief instructions on commissioning
2.1 Commissioning on PROFIBUS DP
ET 200M
Operating Instructions, 12/2008, EWA-4NEB780600602-08
23
Number Item
Order number (Siemens)
1
Side cutters and wire stripping tools
commonly available
1
Tool for crimping wire-end ferrules
commonly available
Approx.
2 m
Stranded wire with 1 mm
2
cross section with
appropriate wire end ferrules, type A, length 6 mm
commonly available
2
one-pin on button
commonly available
1
24 V indicator lamp
commonly available
2.1.2
Mounting the ET 200M
Procedure
1.
Mount the rail on a firm base so that there is at least 40 mm clearance above and below
the rail.
2.
Starting from the left side, mount the individual modules on the rail (plug in the bus
connectors (not for PS 307 and the last module) – engage – swing in – screw down).
Observe the following sequence:
–
Power supply PS 307
–
Interface module IM 153-2
–
DI module SM 321
–
DO module SM 322
3.
Set PROFIBUS address 3 on the interface module IM 153-2.
%86
21
0
/
0
'&9
$''5(66
,0
Figure 2-2
Setting PROFIBUS address 3
Содержание IM 153-4 PN
Страница 186: ...Functions 8 9 SNMP ET 200M 184 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...
Страница 226: ...Interrupt error and system messages 9 2 PROFINET IO ET 200M 224 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...
Страница 254: ...Order Numbers for the ET 200M ET 200M 252 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...
Страница 268: ...Glossary ET 200M 266 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...