ET 200M
Operating Instructions, 12/2008, EWA-4NEB780600602-08
21
Brief instructions on commissioning
2
2.1
Commissioning on PROFIBUS DP
2.1.1
Introduction
Introduction
The following simple example shows you how to commission the ET 200M step by step.
●
Installing and wiring the ET 200M
●
Configuring with
STEP 7
●
Linking to the User Program
●
Switching on the ET 200M
●
Evaluating the diagnostics:
–
Encoder supply short circuit after M on the digital input module
–
Short circuit after L+ on the digital output module
Requirements
●
You have configured an S7 station, consisting of a power supply module and a
DP master (e.g. CPU 315-2 DP). For this example a CPU 315-2 DP is used as the
DP master. You can of course use any other DP master (standard
IEC 61784-1:2002 Ed1 CP 3/1).
●
The current
STEP 7 version is fully installed on your programming device (PD). There
may be restrictions if using older versions of
STEP 7. You have experience with STEP 7.
●
The PD is connected to the DP master.
Содержание IM 153-4 PN
Страница 186: ...Functions 8 9 SNMP ET 200M 184 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...
Страница 226: ...Interrupt error and system messages 9 2 PROFINET IO ET 200M 224 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...
Страница 254: ...Order Numbers for the ET 200M ET 200M 252 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...
Страница 268: ...Glossary ET 200M 266 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...