575
Installation and Removing
Section 11-4
11-4 Installation and Removing
Installation
The following processing explains how to install and remove a LCD Option Board.
!Caution
Always turn OFF the power supply to the CPU Unit and wait until all the oper-
ation indicators go out before installing or removing the LCD Option Board.
1,2,3...
1. Press the up/down lock levers on both sides of the Option Board slot cover
1 at the same time to unlock the cover, and then pull the cover out.
2.
Check the alignment to make the corner cut of the LCD Option Board fit in
the Option Board slot 1, and firmly press the LCD Option Board in until it
snaps into place.
3.
Switch DipSW4 of the CPU Unit to ON.
Note
DipSW4 is OFF at shipment
Removing
Press the up/down lock levers on both sides of the LCD Option Board at the
same time to unlock the Option Board, and then pull it out.
MAC Address:
01234567890A
00
NC
02
04
06
08
10
00
02
04
06
08
10
01
COM
03
05
07
09
11
01
03
05
07
09
11
BKUP
ERR/ALM
LNK/ACT
SYSMAC
CP1L
POWER
RUN
INH
1
00
01
02
03
04
06
00
01
03
04
06
COM
02
COM
05
07
COM
COM(V+)
05
07
ANALOG INPUT
V1+ V2+ COM
2
LCD Option Board
Front
Back
Corner Cut
Operation indicators
Option Board slot 1
ESC
OK
00
NC
02
04
06
08
10
00
02
04
06
08
10
01
COM
03
05
07
09
11
01
03
05
07
09
11
BKUP
ERR/ALM
LNK/ACT
POWER
RUN
INH
1
2
00
01
02
03
04
06
00
01
03
04
06
COM
02
COM
05
07
COM
COM(V+)
05
07
MAC Address:
01234567890A
ANALOG INPUT
V1+ V2+ COM
ESC
OK
ON
1
2
3
4
5
6
DipSW4
Press
Press
Lock lever
Lock lever
ESC
OK
ESC
OK
Содержание CP1L-EL20DR-D
Страница 3: ...CP1L EL20D CP1L EM30D CP1L EM40D CP1L EL EM CPU Unit Operation Manual Produced July 2017...
Страница 4: ...iv...
Страница 10: ...x...
Страница 22: ...xxii...
Страница 34: ...xxxiv Software Licenses and Copyrights 7...
Страница 178: ...144 Connecting the CX Programmer Section 5 1 Click the Connect button to connect and then connection online is completed...
Страница 192: ...158 Trial Operation and Debugging Section 5 3...
Страница 250: ...216 Automatic Clock Adjustment and Specifying Servers by Host Name Section 6 7...
Страница 666: ...632 Trouble Shooting Section 11 7...
Страница 696: ...662 Standard Models Appendix A...
Страница 805: ...771 Connections to Serial Communications Option Boards Appendix F Connecting to Unit...
Страница 806: ...772 Connections to Serial Communications Option Boards Appendix F...
Страница 836: ...802 PLC Setup Appendix G...
Страница 838: ...804 TCP Status Transitions Appendix H...
Страница 840: ...806 Ethernet Network Parameters Appendix I...
Страница 842: ...808 Buffer Configuration CP1L EL EM Appendix J...
Страница 844: ...810 Ethernet Specifications Appendix K...
Страница 851: ...Index 817 work words 118 write protection 447...
Страница 852: ...818 Index...
Страница 854: ...820 Revision History...
Страница 855: ......