Page 44
Transport/Start up
Group 5
Release 2.02
JET3 Series
5.4 Start-up Commissioning
For a safe transport some hydraulic components are supplied with transportation protection
(cable ties) and the reservoir tanks are evacuated. The following steps have to be carried
out before the initial operation
Remove the transportation protection (cable ties) (Step 1)
Fill the reservoir tank (Step 2)
Carry out the function <Filling Routine> (Step 3)
5.4.1 Remove transportation safety devices - Step 1
The pumps and valves of the hydraulic system are secured with cable ties. These
have to be
absolutely removed.
Proceeding:
Dismantle the backplane of the hydraulic cabinet
(1)
by loosing the fixing screws
(2)
.
ATTENTION
The cable tie at the main filter (3) should not be removed!
Remove the transportation protection (cable ties).
Now attach the backplane of the hydraulic cabinet again with the according fixing screws.
Содержание JET3
Страница 1: ...Operating Manual V2 02 Please keep for future reference ...
Страница 2: ......
Страница 21: ...Group 2 Safety Page 19 JET3 Series Release 2 02 2 4 Safety sticker Figure 1 Safety sticker Safety sticker ...
Страница 380: ...Page 378 Appendix Connection Examples for the Interfaces Group 12 Release 2 02 JET3 Series Interface X3 Outputs ...
Страница 390: ...Page 388 Appendix List of illustrations Group 12 Release 2 02 JET3 Series 12 4 2 Print head SK 6 ...
Страница 391: ...Group 12 Appendix List of illustrations Page 389 JET3 Series Release 2 02 12 4 3 Print head SK 4 Option ...
Страница 392: ...Page 390 Appendix List of illustrations Group 12 Release 2 02 JET3 Series 12 4 4 Cabinet JET printer ...