Group 8
Job Editor
Page 85
JET3 Series
Release 2.02
Figure 28
Assembly of the external print head ventilation
Outside
Inside
Connection diagram:
1
–
rear panel of the housing
3
–
Supply air hose
2
–
pressure regulator valve
4
–
Throttle valve for the head ventilation
2.1
–
adjusting knob
5
–
Throttle valve for the housing ventil.
2.2
–
manometer
6
–
Hose for the print head ventilation
2.3
–
Condensate container (cartridge)
7
–
Hose for the housing ventilation
1
2
3
2.1
6
7
2.3
2.2
5
4
60 l/h
60 l/h
1,4 Bar
Both of the throttle valves are adjusted
exactly and should
not
be changed!
Содержание JET3
Страница 1: ...Operating Manual V2 02 Please keep for future reference ...
Страница 2: ......
Страница 21: ...Group 2 Safety Page 19 JET3 Series Release 2 02 2 4 Safety sticker Figure 1 Safety sticker Safety sticker ...
Страница 380: ...Page 378 Appendix Connection Examples for the Interfaces Group 12 Release 2 02 JET3 Series Interface X3 Outputs ...
Страница 390: ...Page 388 Appendix List of illustrations Group 12 Release 2 02 JET3 Series 12 4 2 Print head SK 6 ...
Страница 391: ...Group 12 Appendix List of illustrations Page 389 JET3 Series Release 2 02 12 4 3 Print head SK 4 Option ...
Страница 392: ...Page 390 Appendix List of illustrations Group 12 Release 2 02 JET3 Series 12 4 4 Cabinet JET printer ...