How to Perform a Study
NXT Owner’s Manual NXT-UM01, MAN2010
35
selected in error, delete the event and continue “filling phase” activities by
pressing the
Pump On
button.
The Cystometry phase will stop 60 seconds after voiding ends. Alternatively click
the
Finish Procedure
button.
A Post Void Residual
window will pop-up. Select the preferred method of
capturing Post Voided Residual (PVR), meaning the amount of fluid remaining in
the bladder at the completion of the voiding phase. Click
OK
to move to the
Review
phase.
3.4.2.3 Review and Report Phases
Review study data and adjust markers in the Review phase. Click the
Report
button to
proceed to the Cystometry Report. Customize and save report layout.
3.5 Tests
The following tests can be completed within Urodynamic studies that provide a
Filling
or
Cystometry
phase.
Stress Test
Commence the stress test once the patient’s bladder had been infused with 150-
200ml of fluid. Position the patient so that the meatus, the urinary opening, is
easily observed.
Select the
Stress Test
toggle button to begin the stress test. Clicking the
Stress
Test
toggle button will automatically stop the pump.
If a leak is observed select the
Leak
button to mark the event.
Select the
Stress Test
toggle button again to end the stress test. A pop-up
window will appear showing a suggested designation for the stress test.
Synergy automatically assigns each stress test based on events marked within the
range. To change the assigned type designation, select the option and press
OK
(Figure 20). Changing the designation will add or remove the events marked in
the stress test.
Figure 20: Stress Test Designation Window
Repeat the test after every 150ml to 200ml infused until stress incontinence is
documented or ruled out.
Finish the selected study.