2-40
DOZER OPERATION
DOZER OPERATION
Dozer down operation
ozer down operation
(1)
(1)
C6
D6
Dozer spool
DOZER
From dozer RCV
Tank passage
P2 Parallel passage
Pc6
14W92MC30
9)
9)
During the dozer down operation, the pilot pressure from the dozer control valve is supplied into
the port Pc6 of the spring side and it shifts the dozer spool in the left direction.
The hydraulic fluid from the pump A1 enters the parallel passage and is direction to the head side
of the dozer cylinder through port D6.
The return flow from the rod side of the dozer cylinder returns to the dozer spool through C6 port.
Thereafter it is directed to the hydraulic tank through tank passage.
In case of the dozer up operation, operation is similar.
C6
D6
Dozer spool
DOZER
Tank passage
P2 Parallel passage
From dozer RCV
Pd6
14W92MC31
Dozer up operation
ozer up operation
(2)
(2)
Содержание HX145 LCR
Страница 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Страница 553: ...8 82 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 636: ...8 164 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 668: ...8 196 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...