5-21
DTC
Diagnostic Criteria
Application
HCESPN FMI
G
C
W
128
0
(when you had conditions mounting pressure sensor)
10 seconds continuous, Boom Down Pilot Press. Sensor Measurement
Voltage > 5.2V
侑
1
(when you had conditions mounting pressure sensor)
10 seconds continuous, 0.3V
≤
Boom Down Pilot Press. Sensor
Measurement Voltage < 0.8V
侑
4
(when you had conditions mounting pressure sensor)
10 seconds continuous, Boom Down Pilot Press. Sensor Measurement
Voltage < 0.3V
侑
(Results / Symptoms)
1. Monitor – Boom Down Pilot Press. display failure
2. Control Function – Boom floating operation failure
(Checking list)
1. CD-85 (#B) – CN-53 (#23) Checking Open/Short
2. CD-85 (#A) – CN-53 (#3) Checking Open/Short
3. CD-85 (#C) – CN-53 (#13) Checking Open/Short
129
0
10 seconds continuous, Arm In Pilot Press. Sensor
Measurement Voltage > 4.8V
侑
1
10 seconds continuous, 0.3V
≤
Arm In Pilot Press. Sensor Measurement
Voltage < 0.8V
侑
4
10 seconds continuous, Arm In Pilot Press. Sensor
Measurement Voltage < 0.3V
侑
(Results / Symptoms)
1. Monitor – Arm In Pilot Press. display failure
2. Control Function – IPC operation failure
(Checking list)
1. CD-90 (#B) – CN-52 (#28) Checking Open/Short
2. CD-90 (#A) – CN-51 (#3) Checking Open/Short
3. CD-90 (#C) – CN-51 (#13) Checking Open/Short
133
0
10 seconds continuous,
Arm In/Out & Bucket In Pilot Press. Sensor Measurement Voltage > 5.2V
侑
1
10 seconds continuous,
0.3V
≤
Arm In/Out & Bucket In Pilot Press. Sensor
Measurement Voltage < 0.8V
侑
4
10 seconds continuous,
Arm In/Out & Bucket In Pilot Press. Sensor Measurement Voltage < 0.3V
侑
(Results / Symptoms)
1. Monitor – Arm In/Out & Bucket In Pilot Press. display failure
2. Control Function – Engine variable horse power control operation failure
(Checking list)
1. CD-35 (#B) – CN-52 (#14) Checking Open/Short
2. CD-35 (#A) – CN-51 (#3) Checking Open/Short
3. CD-35 (#C) – CN-51 (#13) Checking Open/Short
G : General C : Crawler Type W : Wheel Type
侍#
Some error codes are not applied to this machine.
Содержание HX145 LCR
Страница 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Страница 553: ...8 82 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 636: ...8 164 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 668: ...8 196 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...