8-175
Assemble sun gear No.2 (12).
After spreading loctite #242, assemble the M10
bolt (6).(4 pcs)
Tightening torque : 5.5
Ü
0.6 kgf · m
(39.8
Ü
4.3 lbf · ft)
Assemble carrier No.1 assembly.
20)
19)
ö
21)
Assemble thrust washer No.2 (11).(4 pcs)
18)
125LCR8TM108
125LCR8TM110
125LCR8TM109
125LCR8TM111
Содержание HX145 LCR
Страница 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Страница 553: ...8 82 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 636: ...8 164 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 668: ...8 196 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...