8-197
1. REMOVAL AND INSTALL
BUCKET CYLINDER
Removal
Expand the arm and bucket fully, lower
the work equipment to the ground and
stop the engine.
Operate the control levers and pedals
several times to release the remaining
pressure in the hydraulic piping.
Loosen the breather slowly to release the
pressure inside the hydraulic tank.
Escaping fluid under pressure can
penetrate the skin causing serious
injury.
Fit blind plugs in the hoses after
disconnecting them, to prevent dirt or dust
from entering.
Set block between bucket cylinder and
arm.
GROUP 9 BOOM, ARM, BUCKET AND DOZER CYLINDERS
1)
Η
(1)
ö
ö
ö
ö
Disconnect bucket cylinder hoses (4)
and put plugs (5) on cylinder pipe.
Disconnect greasing piping (6).
Ι
Κ
Remove bolt (2), nut (3) and pull out pin
(1).
Tie the rod with wire to prevent it from
coming out.
Θ
ö
Bucket Cylinder
Arm
Wooden block
1
2
3
4
4
5
6
13031GE18
140WF8DA14
21078DA15
235ZF8DA16
Содержание HX145 LCR
Страница 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Страница 553: ...8 82 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 636: ...8 164 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 668: ...8 196 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...