2-80
Chamber B
9
7
b
a
35
36
1
P
Shuttle valve
a
b
High pressure
Fluid
Pressure
shift line
2 speed
control
solenoid
valve (Off)
(Pi=0)
Dr
145Z9A2TM13
TWO SPEED (LOW SPEED - HIGH SPEED) CHANGEOVER EQUIPMENT
TWO SPEED (LOW SPEED - HIGH SPEED) CHANGEOVER EQUIPMENT
Rotating speed of the motor depends on slope angle of swash plate (9). Motor rotates slow when
the angle is large, and rotates fast when the angle is small.
Low speed
ow speed
When pilot pressure signal Pi=0, spool (35) is located at right side by the spring (36) force and
chamber A is connected to casing drain through hole S1. At this spool position, swash plate (9)
sustain large angle, and motor rotate at low speed.
5)
5)
•
•
Содержание HX145 LCR
Страница 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Страница 553: ...8 82 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 636: ...8 164 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 668: ...8 196 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...