2. CARRIER ROLLER
REMOVAL
Loosen tension of the track link.
(1)
1)
Frame
Jack
1
2
Carrier roller
Carrier
roller
Grease
valve
INSTALL
Carry out installation in the reverse order
to removal.
2)
(1)
Loosen the lock nut (1).
Â
Tightening torque : 29.7
Ü
4.4 kgf
Â
m
(215
Ü
31.8 lbf
Â
ft)
Open bracket(2) with a screwdriver, push
out from inside, and remove carrier roller
assembly.
Â
Weight : 20 kg (45 lb)
(3)
(4)
Jack up the track link height enough to
permit carrier roller removal.
(2)
8-162(1)
8-162(2)
8-162(3)
Содержание HX145 LCR
Страница 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Страница 553: ...8 82 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 636: ...8 164 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 668: ...8 196 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...