6-24
GROUP 3 ELECTRICAL SYSTEM
GROUP 3 ELECTRICAL SYSTEM
1. WHEN STARTING SWITCH IS TURNED ON, MONITOR PANEL DISPLAY DOES NOT APPEAR
1. WHEN STARTING SWITCH IS TURNED ON, MONITOR PANEL DISPLAY DOES NOT APPEAR
·
Before disconnecting the connector, always turn the starting switch OFF.
·
Before carrying out below procedure, check all the related connectors are properly inserted and
short of fuse No. 7, 10.
·
After checking, insert the disconnected connectors again immediately unless otherwise specified.
YES
YES
NO
NO
Check voltage
between
CN-56A (2)
and (3)
Check voltage
between CN-5
(9) and (10)
CLUSTER
BATT (24V)
GND
POWER IG (24V)
1
2
3
CN-56A
11
10
9
CN-5
NO.7
FUSE
NO.10
FUSE
12
15
CN-36-1
Starting switch : ON
Voltage : 20~32V
Cause
Remedy
Defective cluster
Disconnection in
wiring harness or
poor contact
between
CN-5-CN-56A
Disconnection in
wiring harness or
poor contact
between CN-5 (9)
-GND or fuse No.
7, 10
Replace
Repair or replace
(after clean)
Repair or replace
(after clean)
145LCR6ES01
Starting switch : ON
Voltage : 20~32V
YES
NO
20~32V
0V
Check voltage
Check voltage
Содержание HX145 LCR
Страница 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Страница 553: ...8 82 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 636: ...8 164 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 668: ...8 196 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...