6-50
TEST PROCEDURE
TEST PROCEDURE
Test 10 : Check voltage at CN-52 (12)
and ground.
Prepare 1 piece of thin sharp pin, steel or
copper.
Inser t prepared pin to rear side of
connectors : One pin to (12) of CN-52.
Starting switch ON.
Check voltage as figure.
MCU
CN-51
CN-52
Female
CN-52
1
2
3
4
5
6
7
8
9
10
31
32
33
34
36
37
38
39
40
11
21
20
30
Multimeter
GROUND
12
PIN
(1)
(1)
①
②
③
④
2)
2)
SPEC : Actuator operating : 1~5 V
300L6MS08
Содержание HX145 LCR
Страница 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Страница 553: ...8 82 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 636: ...8 164 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 668: ...8 196 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...