8-215
8-215
1. TRACK LINK
REMOVAL
Move track link until master pin is over
front idler in the position put wooden
block as shown.
Loosen tension of the track link.
If track tension is not relieved when the
grease valve is loosened, move the
machine backwards and forwards.
Unscrew the grease nipple after release
the tension by pushing the poppet only
when necessarily required.
Grease leaking hole is not existing. So,
while unscrew the grease nipple, grease
is not leaking until the grease nipple is
completely coming out. If the tension is
not released in advance, the grease
nipple can be suddenly popped out by
pressurized grease.
Push out master pin by using a suitable
tool.
GROUP 10 UNDERCARRIAGE
1
90~110
1)
(1)
(2)
ö
ö
(3)
Master pin
Block
8-161(1)
140Z98UC04
140Z98UC05
INSTALL
Carry out installation in the reverse order
to removal.
Adjust the tension of the track link.
2)
(1)
ö
Move the machine slowly in reverse, and
lay out track link assembly (1).
Jack up the machine and put wooden
block under the machine.
Don't get close to the sprocket side as the
track shoe plate may fall down on your
feet.
(4)
ö
ö
Содержание HX145 LCR
Страница 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Страница 553: ...8 82 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 636: ...8 164 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 668: ...8 196 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...