6-66
TEST PROCEDURE
TEST PROCEDURE
Test 18
Test 18: Check voltage between connector
CN-88 (2) - GND.
Disconnect connector CN-88 from power
max solenoid valve.
Start switch ON.
Check voltage as figure.
(1)
(1)
①
②
③
2)
2)
Test 19
Test 19: Check resistance of the solenoid
valve between CN-88 (1)-(2).
Starting switch OFF.
Disconnect connector CN-88 from power
max solenoid valve.
Check resistance as figure.
(2)
(2)
①
②
③
LH RCV-lever
Power max switch
Power max
solenoid valve
CN-88
Multimeter
1
2
1
2
21096MS14B
LH RCV-lever
Power max switch
Power max
solenoid valve
CN-88
Multimeter
1
2
1
2
GROUND
SPEC : Starting switch ON : 24
±
1V
Starting switch OFF : 0V
SPEC : 15~35
Ω
21096MS14A
Содержание HX145 LCR
Страница 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Страница 553: ...8 82 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 636: ...8 164 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 668: ...8 196 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...