7-7
TRAVEL DEVIATION
Measure the deviation by the tracks from
a 20m straight line.
Preparation
Adjust the tension of both tracks to be
equal.
Provide a flat, solid test yard 20 m in
length, with extra length of 3 to 5 m on
both ends for machine acceleration and
deceleration.
Hold the bucket 0.3 to 0.5 m above the
ground with the arm and bucket rolled in.
Keep the hydraulic oil temperature at
50
Ü
5˚C.
Measurement
Measure the amount of mistracking at
high and low travel speeds.
Before beginning each test, select the
following switch positions.
Power mode switch : P mode
Star t traveling the machine in the
acceleration zone with the travel levers at
full stroke.
Measure the distance between a straight
20 m line and the track made by the
machine. (Dimension a)
After measuring the tracking in forward
travel, turn the upperstructure 180
Á
and
measure that in reverse travel.
Repeat steps
Κ
and
Λ
three times and
calculate the average values.
Evaluation
0.3~0.5m
5)
(1)
(2)
Η
Θ
Ι
Κ
(3)
Η
Θ
Â
Ι
Κ
Λ
Μ
Unit : mm / 20 m
Mistrack should be within the following specifications.
3~5 m extra length
3~5 m extra length
20M
a
Model
HX145CR
HX145LCR
Standard
200 below
Maximum allowable
240
Remarks
(4)
145ZF7MS04
(210-7) 7-7(2)
Содержание HX145 LCR
Страница 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Страница 553: ...8 82 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 636: ...8 164 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 668: ...8 196 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...