2-49
REDUCTION GEAR
REDUCTION GEAR
1 Ring
gear
2 Drive
shaft
3 Bearing
4 Bearing
5 Ring
nut
6 Lock
plate
7 Hexagon
bolt
8 Casing
9 Socket
bolt
10 Carrier
No.
2
11 Planetary gear No. 2
12 Needle bearing No. 2
13 Thrust washer No. 2
14 Carrier pin No. 2
15 Spring
pin
16 Sun gear No. 2
17 Carrier
No.
1
18 Planetary gear No. 1
19 Needle bearing No. 1
20 Thrust washer No. 1
21 Carrier pin No. 1
22 Sun gear No. 1
23 Snap
ring
24 Thrust
plate
25 Sleeve
26 O-ring
27 Oil
seal
30 Plug
31 Parallel
pin
32 Thrust washer No. 1
2 25 26 27
8 7 15 11 12 14 13 21 15 20 18 19 32 23 9
6 31 24 1 10 16 17 24 22
5
4
30
3
2)
2)
125LCR2SM23
Содержание HX145 LCR
Страница 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Страница 553: ...8 82 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 636: ...8 164 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 668: ...8 196 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...