2-25
TRAVEL OPERATION
TRAVEL OPERATION
TRAVEL FORWARD OPERATION
TRAVEL FORWARD OPERATION
2)
2)
(1)
(1)
C1
D1
A1
B1
From RCV
From RCV
P1 Bypass passage
P2 Bypass passage
TRAVEL LEFT
TRAVEL RIGHT
Tank passage
Pb1
Pc1
14092MC18
During the travel forward operation, the hydraulic fluid of the pump A2 is supplied to the travel left
motor and the hydraulic fluid of the pump A1 is supplied to the other travel right motor.
The pilot pressure from the pilot control valve is supplied to the spring side of pilot port (pb1, pc1).
And it shifts travel right and left spools in the left direction against springs. Hydraulic fluid from the
pump A1 flow into the travel right spool through the bypass passage and hydraulic fluid from the
pump A2 flow into the travel left spool through the bypass passage.
Then they are directed to the each travel motor through port A1 and C1. As a result, the travel
motors turn and hydraulic fluid returns to the tank passage through the travel spools.
In case of the reverse operation, the operation is similar.
TRAVEL LEFT
TRAVEL RIGHT
C1
D1
A1
B1
From RCV
From RCV
P1 Bypass passage
Tank passage
P2 Bypass passage
Pa1
Pd1
14092MC17
TRAVEL BACKWARD OPERATION
TRAVEL BACKWARD OPERATION
(2)
(2)
Содержание HX145 LCR
Страница 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Страница 553: ...8 82 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 636: ...8 164 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 668: ...8 196 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...