8-203
2. DISASSEMBLY AND ASSEMBLY
STRUCTURE
Bucket cylinder
1)
(1)
23, 25
Internal detail
27
28
26
9,10 6,7 8 4,5 22
29
30
3 11,12
1
2
13 14 17
15 18,19 20 21
16
24, 25
1
Tube assembly
2
Rod assembly
3
Gland
4
DD2 bushing
5
Snap ring
6
Rod seal
7
Back up ring
8
Buffer ring
9
Dust wiper
10 Snap ring
11 O-ring
12 Back up ring
13 Cushion ring
14 Piston
15 Piston seal
16 Wear ring
17 Dust ring
18 O-ring
19 Back up ring
20 Lock nut
21 Hexagon socket set screw
22 Hexagon socket head bolt
23 Pin bushing
24 Pin bushing
25 Dust seal
26 Band assembly
27 Pipe assembly-R
28 Pipe assembly-B
29 O-ring
30 Hexagon socket head bolt
145WF8CY01
Содержание HX145 LCR
Страница 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Страница 553: ...8 82 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 636: ...8 164 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 668: ...8 196 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...