REPLENISH OXYGEN SYSTEM continued
2. Connect the oxygen charging rig to the airplane charging valve as follows:
WARNING:
BEFORE BONDING THE OXYGEN CHARGING RIG TO THE AIRPLANE, MAKE
SURE BOTH THE RIG AND THE AIRPLANE ARE INDIVIDUALLY BONDED TO
GROUND.
(a) Make sure the airplane is bonded to ground.
(b) On the oxygen charging rig, connect one bonding cable to ground.
(c) Connect the bonding cable on the charging rig to an appropriate bonding stud on the airplane.
(d) Remove the charging valve cap and connect the hose from the oxygen charging rig to the
charging valve.
WARNING:
DO NOT OPEN VALVES OR INCREASE PRESSURE RAPIDLY.
3. Open the rig delivery valve and set the regulator valve to charge the system slowly to approximately
1900 psi.
4. Close the rig delivery valve and allow the system to cool to ambient temperature.
5. Check the system contents on the adjacent contents indicator and top up if necessary until the
indicator shows FULL, when the system pressure will be 1800 psi at 21° C.
6. Remove the oxygen charging rig from the airplane as follows:
(a) If a top up of the system was performed, make sure the rig delivery valve is closed.
(b) Disconnect the hose from the oxygen charging valve and install the charging valve cap.
(c) Remove the bonding cable from the charging rig to the bonding stud on the airplane.
(d) Remove the bonding cable from ground to the charging rig.
(e) Remove the airplane ground bonding.
(f) Close and secure the charging point access door.
Содержание Hawker 800XP
Страница 18: ...Page 16 of 16 P N 140 590032 0007 Revision A5 Feb 2012 Pilot s Operating Manual Intentionally left blank...
Страница 20: ...Page 2 of 2 Pilot s Operating Manual P N 140 590032 0007LOTC September 22 2010 Intentionally left blank...
Страница 22: ...Page 2 of 2 P N 140 590032 0007A5 Log Of Revisions Intentionally left blank...