
Page 2-13
Pilot’s Operating Manual
Revision A2: Nov, 2004
Sub-section 2
GROUND SERVICING
Hawker 800XP Pro Line 21
Section VI - GROUND OPERATIONS
OPERATION OF THE PRESSURE REFUELING COUPLING (Figure 7)
To Remove The Cover From The Airplane Coupling
1. Open the access door.
2. Slide the finger hole towards the center to release the handle.
3. Rotate the handle counter-clockwise to remove the cover.
To Connect The Hose End Pressure Controller (HEPC)
1. Check the air pressure gauge on the HEPC registers 50 lb./sq.in.
2. Remove the dust cover from the HEPC.
3. Holding the handwheel, push the nose coupling of the HEPC into engagement with the airplane
coupling.
4. Rotate the HEPC clockwise to the limit of its travel, approximately 40°.
5. Connect the HEPC ground clip to the grounding point.
6. Move the valve operating lever to the OPEN position to engage the interlock.
To Disconnect The Hose End Pressure Controller (HEPC)
1. Move the valve operating lever to the CLOSED position.
2. Disconnect the HEPC ground clip from the grounding point.
3. Rotate the handwheel counter-clockwise and disengage the HEPC from the airplane coupling.
4. Install the dust cover to the HEPC.
To Install The Cover To The Airplane Coupling
1. Stow the lanyard into the container of the cover.
2. Install the cover to the airplane coupling.
3. Turn the cover clockwise to lock and then close the handle.
4. Close the access door.
Содержание Hawker 800XP
Страница 18: ...Page 16 of 16 P N 140 590032 0007 Revision A5 Feb 2012 Pilot s Operating Manual Intentionally left blank...
Страница 20: ...Page 2 of 2 Pilot s Operating Manual P N 140 590032 0007LOTC September 22 2010 Intentionally left blank...
Страница 22: ...Page 2 of 2 P N 140 590032 0007A5 Log Of Revisions Intentionally left blank...