Page 1-15
Pilot’s Operating Manual
P/N 140-590032-0007
Revision A4: Sep, 2010
Section VI Sub-section 1
GROUND HANDLING
PARKING and MOORING
PARKING
Parking Procedure
1. Position the airplane nose into wind and center the nose gear wheels.
2. Place the WHEELBRAKE lever fully to the PARK position.
3. Install the landing gear locking pins (Figure 2). If required, the nose gear doors can be opened
manually.
4. Install the thrust reverser locking pins (Figure 3).
5. Install the internal flying control gust locks (Figures 7 and 8).
6. Check that a pressure of 2000 psi minimum is indicated on the emergency brake accumulator
gauge in the rear equipment bay. If necessary, top up the system by operating the hydraulic hand
pump located adjacent to the accumulator.
7. Position the wheel chocks front and rear of the nose and main gear wheels.
8. Once the airplane is chocked, the WHEELBRAKE lever can be released.
CAUTION:
ALLOW PITOT HEADS TO COOL BEFORE INSTALLING THE PITOT COVERS.
9. Install the protective covers and blanks as necessary (Figure 4).
10. If the ambient temperature is likely to drop below freezing point, drain the water/waste system.
Figure 2
Landing Gear Locking Pins Location
Содержание Hawker 800XP
Страница 18: ...Page 16 of 16 P N 140 590032 0007 Revision A5 Feb 2012 Pilot s Operating Manual Intentionally left blank...
Страница 20: ...Page 2 of 2 Pilot s Operating Manual P N 140 590032 0007LOTC September 22 2010 Intentionally left blank...
Страница 22: ...Page 2 of 2 P N 140 590032 0007A5 Log Of Revisions Intentionally left blank...