
GE Analytical Instruments ©2010
52 of 226
DLM 74001-04 Rev. A
Chapter 3: Installation
Wiring the Remote Start (Binary Input) Connection
The On-Line Analyzer remote start (binary input) connection can be wired in a variety of ways and is intended to
execute a start/stop command to the Analyzer from a remote location, such as a Process Logic Control (PLC)
System or Center. Wiring examples are shown in Figure 4 and Figure 5.
Note that binary input must be activated in the Analyzer firmware later. It is important to confirm the correct
signal strength before setting binary input to
On
, to avoid unexpectedly starting or stopping analysis. For more
information on activating binary input, see “Activating Binary Input” on page 81.
Figure 4: Wiring Option for Binary Input Using Analyzer’s Internal Supply
10 (24 V gnd)
9 (+24 V)
8 (-)
7 (+)
TB2
Internal to Analyzer
Relay
Driver
Local Control
External to Analyzer
K1
+
Method 1 - Using the Internal 24 V of Analyzer As Source Supply
Conduit
K1 = Custom Computer Terminal
Содержание Sievers 500 RL
Страница 8: ...GE Analytical Instruments 2010 8 of 226 DLM 74001 04 Rev A ...
Страница 10: ...GE Analytical Instruments 2010 10 of 226 DLM 74001 04 Rev A ...
Страница 36: ...GE Analytical Instruments 2010 36 of 220 DLM 74001 04 Rev A ...
Страница 66: ...GE Analytical Instruments 2010 66 of 226 DLM 74001 04 Rev A Chapter 3 Installation ...
Страница 152: ...GE Analytical Instruments 2010 152 of 226 DLM 74001 04 Rev A Chapter 7 Maintenance ...
Страница 170: ...GE Analytical Instruments 2010 170 of 226 DLM 74001 04 Rev A Chapter 8 Troubleshooting ...
Страница 177: ...Appendix A GE Analytical Instruments 2010 177 of 186 DLM 74001 04 Rev A Figure 51 Left Side Analyzer Dimensions ...
Страница 178: ...Appendix A GE Analytical Instruments 2010 178 of 186 DLM 74001 04 Rev A ...
Страница 185: ...Notes GE Analytical Instruments 2010 185 of 186 DLM 74001 04 Rev A 186 ...
Страница 186: ...Notes GE Analytical Instruments 2010 186 of 186 DLM 74001 04 Rev A 186 ...