GE Power Management
LPS-D Line Protection System
10-
11
10 ALPS TEST PROGRAM
10.3 FILE MENU
10
10.3.3 OPEN SETTING FILE
The following is a list of protection setting numbers whose values are used by this test program.
102
Z1PREACH
Z1 Phase Reach
105
Z1GRDREACH
Z1 Ground Reach
108
Z1GROUNDK0
Z1 Ground K0
202
Z2PHREACH
Z2 Phase Reach
203
Z2PCHARANG
Z2 Phase Characteristic Angle
206
Z2GRDREACH
Z2 Ground Reach
207
Z2GCHARANG
Z2 Ground Characteristic Angle
302
Z3PHREACH
Z3 Phase Reach
303
Z3PCHARANG
Z3 Phase Characteristic Angle
305
Z3GRDREACH
Z3 Ground Reach
306
Z3GCHARANG
Z3 Ground Characteristic Angle
402
Z4PHREACH
Z4 Phase Reach
403
Z4PCHARANG
Z4 Phase Characteristic Angle
406
Z4GRDREACH
Z4 Ground Reach
407
Z4GCHARANG
Z4 Ground Characteristic Angle
408
Z4DIRECTN
Z4 Direction
1401
POSSEQANG
Pos. Seq. Impedance Angle
1402
ZERSEQANG
Zero Seq. Impedance Angle
1404
ZEROSEQK0
Z0 / Z1 ratio
1601
MOBZONE
Coordinating Zone
1602
MOBCHARANG
MOB Characteristic Angle
This menu item results in a dialog box supplied by Microsoft. Therefore only the OK button of the dialog box is
tested to make sure the file was properly opened.
Select Open Setting File from the File menu. Select a file that is not a setting file and not a test file. Verify the
following:
•
A message box is displayed that explains the error.
•
The currently active test has not changed from before the open command.
Select Open Setting File from the File menu. Select a setting file containing no errors and click the OK button
to open it. Select each test.
Verify that the values in each dialog box which correspond to settings are the same as those in the setting file.
Edit an existing setting file using a text editor. Remove a setting line which contains a user entered value.
Select Open Setting File from the File menu. Select the edited setting file. Select a test that uses the setting
value that was deleted. Verify the following:
•
No error message is displayed.
•
The corresponding test value is the default value.
Содержание LPS-D
Страница 2: ......
Страница 4: ......
Страница 164: ...3 14 LPS D Line Protection System GE Power Management 3 3 PRINTED CIRCUIT BOARD MODULES 3 HARDWARE DESCRIPTION 3 ...
Страница 226: ...7 4 LPS D Line Protection System GE Power Management 7 1 RATINGS 7 SPECIFICATIONS 7 ...
Страница 284: ...10 20 LPS D Line Protection System GE Power Management 10 8 HELP MENU 10 ALPS TEST PROGRAM 10 ...
Страница 334: ...A 4 LPS D Line Protection System GE Power Management A 1 FREQUENTLY ASKED QUESTIONS APPENDIXA A ...
Страница 412: ...C 34 LPS D Line Protection System GE Power Management C 3 POINT LISTS APPENDIXC C ...
Страница 416: ...D 4 LPS D Line Protection System GE Power Management D 1 KEYPAD MENUS APPENDIXD D ...
Страница 422: ...F 2 LPS D Line Protection System GE Power Management F 1 WARRANTY INFORMATION APPENDIXF F ...
Страница 435: ...GE Power Management LPS D Line Protection System xiii INDEX INDEX tests 6 11 ZONE TIMER functional tests 5 10 ...
Страница 436: ...xiv LPS D Line Protection System GE Power Management INDEX INDEX ...