GE Power Management
LPS-D Line Protection System
10-
5
10 ALPS TEST PROGRAM
10.2 TEST CALCULATIONS
10
10.2.5 M1 PHASE UNITS – ZONE 1
The following dialog box is displayed for this test. The values are the default values used when the user selects
New Test File from the File menu.
Figure 10–6: M1 PHASE UNITS – ZONE 1 DIALOG BOX
10.2.6 MT PHASE UNITS – ZONE 2
The following dialog box is displayed for this test. The values are the default values used when the user selects
New Test File from the File menu.
Figure 10–7: MT PHASE UNITS – ZONE 2 DIALOG BOX
Содержание LPS-D
Страница 2: ......
Страница 4: ......
Страница 164: ...3 14 LPS D Line Protection System GE Power Management 3 3 PRINTED CIRCUIT BOARD MODULES 3 HARDWARE DESCRIPTION 3 ...
Страница 226: ...7 4 LPS D Line Protection System GE Power Management 7 1 RATINGS 7 SPECIFICATIONS 7 ...
Страница 284: ...10 20 LPS D Line Protection System GE Power Management 10 8 HELP MENU 10 ALPS TEST PROGRAM 10 ...
Страница 334: ...A 4 LPS D Line Protection System GE Power Management A 1 FREQUENTLY ASKED QUESTIONS APPENDIXA A ...
Страница 412: ...C 34 LPS D Line Protection System GE Power Management C 3 POINT LISTS APPENDIXC C ...
Страница 416: ...D 4 LPS D Line Protection System GE Power Management D 1 KEYPAD MENUS APPENDIXD D ...
Страница 422: ...F 2 LPS D Line Protection System GE Power Management F 1 WARRANTY INFORMATION APPENDIXF F ...
Страница 435: ...GE Power Management LPS D Line Protection System xiii INDEX INDEX tests 6 11 ZONE TIMER functional tests 5 10 ...
Страница 436: ...xiv LPS D Line Protection System GE Power Management INDEX INDEX ...