GE Power Management
LPS-D Line Protection System
2-
73
2 CALCULATION OF SETTINGS
2.5 REFERENCE TABLES
2
2.5.4 PROTECTION SETTINGS DATA SHEETS
Table 2–10: PROTECTION SETTINGS DATA SHEET (Sheet 1 of 9)
No.
M nem onic
Description
Range (5A)
Range (1A)
User Setting
Z1DISTANCE
101
Z1PHASE
Z1 Phase Distance
NO, YES
102
Z1PHREACH
Z1 Phase Reach
0.01 to 50.0
Ω
step 0.01
0.05 to 250.0
Ω
step 0.05
103
Not used
104
Z1GROUND
Z1 Ground Distance
NO, YES
105
Z 1G R D R E A C H
Z1 Ground Reach
0.01 to 50.0
Ω
step 0.01
0.05 to 250.0
Ω
step 0.05
106
Z1GRDCHAR
Z1 Ground Characteristic
MHO, REACT, QUAD
†
107
Z1SUREACH
Z1 Ground Reaction Mho
Supervision Reach
0.01 to 50.0
Ω
step 0.01
0.05 to 250
Ω
step 0.05
108
Z1GROUNDK0
Z1 Ground K0
1.0 to 7.0 step 0.01
109
Not used
110
Z1BLOCK
Blocking Supervision of Z1
NO, YES
111
‡
Z 1G C H A R A N G
Z1 Ground Characteristic Timer
Angle
80° to 155° step 1
112
‡
Z1RGREACH
Z1 Resistive Ground Reach
0.01 to 100.00
Ω
step 0.01
0.05 to 500
Ω
step 0.01
Z2DISTANCE
201
Z2PHASE
Z2 Phase Distance
NO, YES
202
Z2PHREACH
Z2 Phase Reach
0.01 to 50.0
Ω
step 0.01
0.05 to 250.0
Ω
step 0.05
203
Z2PCHARANG
Z2 Phase Characteristic Angle
90° to 120° step 5
204
Z2GROUND
Z2 Ground Distance
NO, YES
205
Z 2G R D C H A R
Z2 Ground Characteristic
MHO, GDOC, MHOGDOC, QUAD
†
206
Z2GRDREACH
Z2 Ground Reach
0.01 to 50.0
Ω
step 0.01
0.05 to 250.0
Ω
step 0.05
207
Z2G C H A R A N G
Z2 Ground Characteristic Angle
80° to 155° step 5
208
Z2TIMERS
Z2 Timers
NO, YES
209
Z2P_TIME
Z2 Phase Timer
0.10 to 3.0 sec. step 0.01
210
Z2G_TIME
Z2 Ground Timer
0.10 to 3.0 sec. step 0.01
†
Setting value QUAD applies to LPS-D Revision B models only.
‡
Setting is applicable to Revision B models only.
^
Setting is applicable to LPS-D models with three phase tripping only.
Содержание LPS-D
Страница 2: ......
Страница 4: ......
Страница 164: ...3 14 LPS D Line Protection System GE Power Management 3 3 PRINTED CIRCUIT BOARD MODULES 3 HARDWARE DESCRIPTION 3 ...
Страница 226: ...7 4 LPS D Line Protection System GE Power Management 7 1 RATINGS 7 SPECIFICATIONS 7 ...
Страница 284: ...10 20 LPS D Line Protection System GE Power Management 10 8 HELP MENU 10 ALPS TEST PROGRAM 10 ...
Страница 334: ...A 4 LPS D Line Protection System GE Power Management A 1 FREQUENTLY ASKED QUESTIONS APPENDIXA A ...
Страница 412: ...C 34 LPS D Line Protection System GE Power Management C 3 POINT LISTS APPENDIXC C ...
Страница 416: ...D 4 LPS D Line Protection System GE Power Management D 1 KEYPAD MENUS APPENDIXD D ...
Страница 422: ...F 2 LPS D Line Protection System GE Power Management F 1 WARRANTY INFORMATION APPENDIXF F ...
Страница 435: ...GE Power Management LPS D Line Protection System xiii INDEX INDEX tests 6 11 ZONE TIMER functional tests 5 10 ...
Страница 436: ...xiv LPS D Line Protection System GE Power Management INDEX INDEX ...