8.1 INTRODUCTION
8 LOCAL USER INTERFACE
8
8.1.17 CHANNEL TEST
This command is used to allow the user to key (turn on) the local transmitter when a channel scheme (POTT1,
POTT2, PUTT, BLOCKING or HYBRID) is used. Protection must be enabled to perform a channel test. If pro-
tection is disabled when channel test is selected, the user will be prompted to enable protection.
If the [3/N] (NO) key is pressed, CANCELED is displayed and the test is canceled. If the [1/Y] (YES) key is
pressed, the relay checks the outputs. If they are enabled, the test item is displayed. If the outputs are dis-
abled, the user is prompted to enable them. If the user responds with [3/N] (NO), CANCELED is displayed and
the test is canceled. If the user responds [1/Y] (YES), the outputs are enabled and the test item is displayed.
If Channel Test is selected, the privilege level must be CONTROL or MASTER and communications must not
be performing an action. If either check fails, an error message is displayed and the test is not performed. The
error message must be cleared by pressing the [CLR] key. When the checks pass and the test is started, the
word ON will be displayed to the right of the item.
When the user selects End Chnl Test, the test is terminated the user is returned to the Actions menu.
8.1.18 KEYPAD/DISPLAY INTERFACE TEST
This command will test the display, keypad, and LEDs. This test does not require a specific privilege level.
The user can select an item by using the arrow keys followed by the [ENT] key.
If Display is chosen, the top two lines of the display will be filled to verify that all LCD dots are working. The
display will prompt the user to press the [ENT] key. The bottom two lines of the display will now be filled. This is
the end of the test. If the [CLR] key is pressed the relay screen is displayed. If the [ACT] key is pressed, the LUI
TEST choices screen will be displayed.
CHANNEL TEST
Enable Protection?
CHANNEL TEST
1.End Chnl Test
2.Channel Test
CHANNEL TEST
1.End Chnl Test
2.Channel Test ON
LUI TEST
1.Display
2.LEDs
3.Keypad
Содержание LPS-D
Страница 2: ......
Страница 4: ......
Страница 164: ...3 14 LPS D Line Protection System GE Power Management 3 3 PRINTED CIRCUIT BOARD MODULES 3 HARDWARE DESCRIPTION 3 ...
Страница 226: ...7 4 LPS D Line Protection System GE Power Management 7 1 RATINGS 7 SPECIFICATIONS 7 ...
Страница 284: ...10 20 LPS D Line Protection System GE Power Management 10 8 HELP MENU 10 ALPS TEST PROGRAM 10 ...
Страница 334: ...A 4 LPS D Line Protection System GE Power Management A 1 FREQUENTLY ASKED QUESTIONS APPENDIXA A ...
Страница 412: ...C 34 LPS D Line Protection System GE Power Management C 3 POINT LISTS APPENDIXC C ...
Страница 416: ...D 4 LPS D Line Protection System GE Power Management D 1 KEYPAD MENUS APPENDIXD D ...
Страница 422: ...F 2 LPS D Line Protection System GE Power Management F 1 WARRANTY INFORMATION APPENDIXF F ...
Страница 435: ...GE Power Management LPS D Line Protection System xiii INDEX INDEX tests 6 11 ZONE TIMER functional tests 5 10 ...
Страница 436: ...xiv LPS D Line Protection System GE Power Management INDEX INDEX ...